We help the world growing since 1998

Short Lead Time for China Steel Climbing Cone for Construction Formwork

Short Description:

Steel formwork is used in construction,Q235 material,it is suitable for big building and midium building.It can be reused 300 times.The impact strength is very high,not easy to damage,not water absorption.


  • :
  • Product Detail

    Product Tags

    We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for Short Lead Time for China Steel Climbing Cone for Construction Formwork, Now now we have recognized steady and long organization relationships with customers from North America, Western Europe, Africa, South America, extra than 60 countries and regions.
    We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for China Climbing Cone, Hihg-Strength Screw, During in 11 years, We’ve participated in more than 20 exhibitions, obtains the highest praise from each customer. Our company has been devoting that “customer first” and committed to helping customers expand their business, so that they become the Big Boss !
    Combined steel formwork,it also be called combination type and customized small steel formwork. Main including plane template,external corner,internal corner, and connecting angle etc.

    Applicable to all kinds of cast-in place reinforced concrete engineering,can be assembled into beams,columns,walls,floor of large formwork according to the design,lifting the overall place,It is more convenient that it also can be used in bulk and the method of disassembly,convenient construccion,strong versatility ,easy assembly ,more use time

    Advantages of steel formwork: reinforcement system, high strength of components, large combined stiffness, high precision of plate production, tight joints, not easy to deform, good integrity of the formwork, strong earthquake resistance

    f4bb83f8c3672b406678e1583b1babd

    Specification and weight 
    Size(mm) Unit weight(kg/pc)
    1200×2100×55 102.96
    1200×1800×55 88.4
    1200×1500×55 74.15
    1200×1200×55 60.11
    1000×1800×55 76.01
    1000×1500×55 63.96
    1000×1200×55 51.6
    1000×900×55 39.32
    900×1800×55 70.89
    900×1500×55 59.47
    900×1200×55 48.03
    750×1800×55 57.8
    750×1500×55 48.47
    750×1200×55 39.16
    750×900×55 29.85
    750×750×55 24.81
    600×1800×55 43.1
    600×1500×55 36.3
    600×1200×55 31.7
    600×900×55 23.9
    600×750×55 18.55
    600×600×55 16.25
    500×1800×55 36.27
    500×1500×55 30.15
    500×1200×55 25.55
    500×900×55 20.38
    500×750×55 15.48
    500×600×55 13.58
    400×1800×55 28.3
    400×1500×55 23.8
    400×1200×55 19.1
    400×900×55 14.6
    400×750×55 12.3
    400×600×55 9.95
    300×1800×55 20.7
    300×1500×55 17.4
    300×1200×55 14
    300×900×55 10.7
    300×750×55 8.8
    300×600×55 7.3
    300×450×55 5.46
    250×1500×55 15.17
    250×1200×55 12.24
    250×900×55 9.32
    250×750×55 7.71
    250×600×55 6.39
    200×1500×55 11.6
    200×1200×55 9.4
    200×900×55 7.1
    200×750×55 5.9
    200×600×55 4.9
    200×450×55 3.64
    150×1500×55 9.5
    150×1200×55 7.7
    150×900×55 5.8
    150×750×55 4.8
    150×600×55 4
    150×450×55 2.98
    100×1500×55 7.5
    100×1200×55 6.9
    100×900×55 4.6
    100×750×55 3.8
    100×600×55 3.1
    100×450×55 2.33

    Application project

    u=471665242,4223949206&fm=26&gp=0i-jianjie-pic05

     

    FAQ

    1.Which is port of loading

    Qingdao,Tianjing,Ningbo,Shanghai

    2.Could you tell us your payment?

    T/T 30% desposit ,70% balance will be paid before shipment;or L/C at sight

    3.When can deliver the goods?

    30 day after deposit ,if urgent ,we can discuss it together

    4.What is packing?

    With pallet.We can send customer the packing picture.

     

     

     We support our buyers with ideal high quality products and high level service. Becoming the specialist manufacturer in this sector, we have gained rich practical experience in producing and managing for Short Lead Time for China Steel Climbing Cone for Construction Formwork, Now now we have recognized steady and long organization relationships with customers from North America, Western Europe, Africa, South America, extra than 60 countries and regions.
    Short Lead Time for China Climbing Cone, Hihg-Strength Screw, During in 11 years, We’ve participated in more than 20 exhibitions, obtains the highest praise from each customer. Our company has been devoting that “customer first” and committed to helping customers expand their business, so that they become the Big Boss !





  • Previous:
  • Next:

  • Related Products