We help the world growing since 1998

Professional Design Modular Plastic Formwork System - Flat tie – Zhongming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our aim is usually to give superior quality items at aggressive rates, and top-notch company to clients around the earth. We have been ISO9001, CE, and GS certified and strictly adhere to their good quality specifications for H Frame Scaffolding Parts Steel, Tubular Metal H Frame Scaffolding, Concrete Plastic Formwork, We can easily offer you by far the most aggressive prices and good quality, because we've been much additional Specialist! So please will not hesitate to call us.
Professional Design Modular Plastic Formwork System - Flat tie – Zhongming Detail:

Flat tie

The overall stability of the concrete poured by the aluminum formwork of the pull-tab system is good,because the pull tab plays a role in it,Is to tightly “pull” between the formwork,before and after the concrete is poured, the formwork is still kept in a relatively stable state, the thickness of the poured concrete is uniform, and the adjustment process is also avoided.

Description

Product name Flat tie
Material Q235
Color Original
Size 100-500mm or customized
Usage Concrete Construction Support
Shade According to drawing

Picture

202012311316379860

202012311317157670

HTB1QKbaRSzqK1RjSZPcq6zTepXaz

FAQ

1.How to buy your ideal products? 

You can provide us your drawing, and we will produce as your drawing.

 Or we can design as your requirements if you do not have a clear plan.

 2.How to pay  

TT and L/C are acceptable and TT will be more appreciated.

3. What is the delivery time?  

It depends on order quantity.

Generally, the delivery time will be within 10 to 15 days.

4.How about our product quality?   

Our steel prop piles are manufactured with first quality materials

 What is steel quality?   

5.This system is built from Q235 steel conical pipe with welded blades,

 and can be applied in a wide variety of different geological locations

6.Port of loading
Tianjin ,Qingdao,Shanghai or Ningbo


Product detail pictures:

Professional Design Modular Plastic Formwork System - Flat tie – Zhongming detail pictures

Professional Design Modular Plastic Formwork System - Flat tie – Zhongming detail pictures


Related Product Guide:

Our target is to consolidate and improve the quality and service of existing products, meanwhile constantly develop new products to meet different customers' demands for Professional Design Modular Plastic Formwork System - Flat tie – Zhongming, The product will supply to all over the world, such as: Southampton, Belarus, Monaco, We care about every steps of our services, from factory selection, product development & design, price negotiation, inspection, shipping to aftermarket. Now we have implemented a strict and complete quality control system, which ensures that each product can meet quality requirements of customers. Besides, all of our solutions have been strictly inspected before shipment. Your Success, Our Glory: Our aim is to help customers realize their goals. We're making great efforts to achieve this win-win situation and sincerely welcome you to join us.
  • We have worked with many companies, but this time is the best,detailed explanation, timely delivery and quality qualified, nice!
    5 Stars By Gail from Belize - 2017.02.18 15:54
    The goods we received and the sample sales staff display to us have the same quality, it is really a creditable manufacturer.
    5 Stars By Raymond from Tajikistan - 2017.08.21 14:13

    Related Products