We help the world growing since 1998

Formwork Anchor Nut - China Manufacturer Alloy 6061 T6 Aluminium Concrete Formwork system – Zhongming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Adhering into the basic principle of "quality, assistance, effectiveness and growth", we have attained trusts and praises from domestic and worldwide client for Scaffolding U Head Jack, Column Plastic Formwork, Plastic Pvc Slab Beam Formwork, On account of superior quality and competitive price , we will be the market leader, please don’t hesitate to contact us by phone or email, if you are interested in any of our products.
Formwork Anchor Nut - China Manufacturer Alloy 6061 T6 Aluminium Concrete Formwork system – Zhongming Detail:

Introduction:

Aluminum formwork is getting more popular because of its light weight and good strength. It requires fewer supports and ties. Aluminum formwork system components include the walls, columns, beams, plates,templates and panel frames. Dedicated pin buckles are used to connect the templates.

The template system can be dismantled at an early stage. Standard specification size of the wall template is 100mm-450mm X 1800mm-2400mm.

Standard specification size of the roof template is 600mm X 600mm-1200mm with standard average weight of 23 kg/m

Specification

Material All aluminum formwork materials made of aluminum alloy
Lateral pressure 30-40 KN/m2.
Weight 25kg/m2.
Reused more than 300 times

 

IMG_20140611_144518

Feature:

Easy to work It is about 23-25kg/m2, light weight means only a single worker could move the Aluminum Formwork easily.
Efficient The Aluminum Formwork System is jointed by the pin, it is two times fast than wood formwork to install and dismantle, so it could save more work and work time.
Saving The Aluminum Formwork System supports early-dismantling application, the construction working cycle is 4-5 days per floor, it is effective for cost saving in human resource and construction management.The Aluminum Formwork can be re-used more than 300 times, the economic cost is very low of every time using.
Safety The Aluminum Formwork system adopts the integrative design, it could load 30-40KN/ m2, which could reduce the safety loophole leaded by the construction and materials.
High quality of construction. The aluminum formwork is made by extrusion process, Legitimate design fine processing with very accurate measurements. The joints are tight, with a smooth concrete surface.No need heavy backing plaster, effectively for plaster cost saving.
Environment friendly The aluminum material of the formwork could also be recovered after project finishing, it avoids the waste.
Clean Different with the wood formwork, there is no wood panel,fragment and other waste in the construction area using the aluminum formwork.
Widely scope of application: The Aluminum Formwork System is suited for application of walls, beams, floors, windows, columns, etc.

 Product application

DSC02298

DSC02299

DSC02304

IMG_20140611_151501(1)

Products detail

Aluminum formwork detail

FAQ

Q1: What is Aluminum Formwork?

Construction system used for forming all of the cast-in-place concrete structures of a building including walls, floors, beams, stairs etc. It can be easily applied to simple column, beam, and slab constructions and offers many advantages over other traditional construction methods.

Q2:What kind of material is used in this panel?
Aluminum alloy 6061

Q3:How do you use it?
Panels are assembled using a very simple pin and wedge system to create a mold for concrete pouring. Walls are held together with high strength wall ties, while slab panels are supported by beams and props. After casting, the panels can be easily removed forreuse.

Q4:Which port of loading
Shanghai,Ningbo,Tianjing or Qingdao main port

 


Product detail pictures:

Formwork Anchor Nut - China Manufacturer Alloy 6061 T6  Aluminium Concrete Formwork system – Zhongming detail pictures

Formwork Anchor Nut - China Manufacturer Alloy 6061 T6  Aluminium Concrete Formwork system – Zhongming detail pictures


Related Product Guide:

The shopper satisfaction is our primary focus on. We uphold a consistent level of professionalism, quality, credibility and repair for Formwork Anchor Nut - China Manufacturer Alloy 6061 T6 Aluminium Concrete Formwork system – Zhongming, The product will supply to all over the world, such as: Bangkok, Victoria, Hungary, High output volume, top quality, timely delivery and your satisfaction are guaranteed. We welcome all inquiries and comments. We also offer agency service---that act as the agent in china for our customers. If you are interested in any of our products or have an OEM order to fulfill, please feel free to contact us now. Working with us will save you money and time.
  • Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Alice from Sierra Leone - 2017.04.28 15:45
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Emma from Lithuania - 2017.08.28 16:02

    Related Products