We help the world growing since 1998

Adjustable Screw Jack Base - H Beam System – Zhongming

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Using a complete scientific high quality management program, superior high quality and superior faith, we acquire great reputation and occupied this industry for Walk Through Scaffolding, Scaffolding Adjustable Screw Jack, Base Jack For Scaffolding, The principle of our company is to provide high-quality products, professional service, and honest communication. Welcome all friends to place trial order for creating a long-term business relationship.
Adjustable Screw Jack Base - H Beam System – Zhongming Detail:

timber beam slab formwork 4

 

timber beam slab formwork 1

 

timber beam slab formwork 2

 

timber beam slab formwork 3

 

Timber Beam Formwork

Flat formwork is made up of plywood,timber beam and steel walingng. Fix plywood with timber beams by tapping screws connect timber beam with steel waling by flange clamp it is easy to assemble, disassemble and adjust in site.
It is light in weight and convenient for construction and transportation. The construction is also very friendly to environment. The plywood has perfect performance. The plywood has good air permeability and water absorbability, the finished concrete surface is clean and smooth. The turnover can reach to 50 times.

 

Timber Beam Floor Formwork
Timber Beam Floor Formwork is widely used in the concrete pouring of slabs. Floor prop or scaffolding matches the supporting head as the supporting system The main beam and secondary beam are timber beams, and plywood is on the topside. The system is flexible, convenient in application and can be reused.
The Supporting Head Series
In the concrete pouring of slab, supporting head series support slab formwork. Some of them can move early or rapidly. According to the demand, the combination of different heads is more cost-effective.

 

 

Timber Beam Wall Formwork
Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas’ formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality.
The system has two parts, formwork and putt-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props. lie-yoke and tie-rod are used to reinforce the corner.

H20 beam formwork luowen catelogue-6

 

 

 

 

FAQ:

1.Packing:Standard export packing

2.Delivery time:30 days,if urgent,pls contact with us

3.Port of loading:Ningbo/Tianjin/Shanghai

4.Price:Very competitive.

5.Quality:High quality


Product detail pictures:

Adjustable Screw Jack Base - H Beam System – Zhongming detail pictures


Related Product Guide:

Sticking for the basic principle of "Super Top quality, Satisfactory service" ,We've been striving to be an excellent business enterprise partner of you for Adjustable Screw Jack Base - H Beam System – Zhongming, The product will supply to all over the world, such as: Saudi Arabia, Dubai, New Zealand, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
  • After the signing of the contract, we received satisfactory goods in a short term, this is a commendable manufacturer.
    5 Stars By Mandy from United States - 2017.05.02 18:28
    This supplier stick to the principle of "Quality first, Honesty as base", it is absolutely to be trust.
    5 Stars By Gary from Malaysia - 2017.11.20 15:58

    Related Products