Aluminum formwork is the fourth generation formwork after plywood formwork, steel formwork, and plastic formwork. Compared with its previous generations, it has the advantages of light weight, high rigidity, and high reusability.

 

The aluminum formwork has the lightest weight among the existing metal formworks, and it can be easily assembled, dismantled, and lifted manually. After the construction of the first floor is completed, the same formwork and components are in the same position of the standard floor, and only repetitive installation and disassembly are required, which greatly reduces the complexity of construction and makes the construction site more concise and clean. Traditional wooden formworks require skilled woodworkers to cooperate with wooden nails and steel pipe frames at the construction site, and on-site cutting is necessary when necessary. This greatly wastes materials, is time-consuming and laborious, and the site appears messy and there are serious problems in every corner of the site. Fire hazards.

 

2

 

Wall pillar aluminum formwork installation

The aluminum formwork is of high quality after the concrete is poured. It can be thinly plastered or not plastered, which greatly reduces the construction cost in the later stage. The verticality and flatness are qualified and even the putty can be directly scraped in the decoration stage. The standardized processing of aluminum formworks makes the dimensional deviation of building components close to zero.

 

After the test, the aluminum formwork has a large number of turnovers. A set of formwork can normally be turned around 300 times. Although the initial cost is high, the cost of each use after the cost is evenly amortized is much lower than that of other formworks, which brings huge economic benefits: It is easy to install and disassemble, especially the specially designed support of the aluminum alloy formwork system has created a mature early dismantling technology, which has been accepted and successfully used in many parts of the world. The normal construction can reach four or five days for one floor, and the project construction phase is greatly shortened. After the construction period, the investment cost of the project has been reduced, the efficiency of capital turnover has been improved, and the economic benefits have been significantly increased.

 

 

In recent years, with the development of the economy and the improvement of people’s living standards, the number of technical personnel on the market has gradually decreased, and labor costs have been rising. Aluminum formwork construction is adopted. Because of its simplicity and easy operation, ordinary personnel can be easily trained. For independent installation, the construction personnel install in order of number, and the human error rate is low. It is precisely because of many advantages that aluminum alloy formworks occupy the domestic market at a rate of nearly 50% every year.