ASTM Standard customized flat tie for fixing formwork system
Flat tie
The overall stability of the concrete poured by the aluminum formwork of the pull-tab system is good,because the pull tab plays a role in it,Is to tightly “pull” between the formwork,before and after the concrete is poured, the formwork is still kept in a relatively stable state, the thickness of the poured concrete is uniform, and the adjustment process is also avoided.
Description
Product name | Flat tie |
Material | Q235 |
Color | Original |
Size | 100-500mm or customized |
Usage | Concrete Construction Support |
Shade | According to drawing |
Picture
FAQ
1.How to buy your ideal products?
You can provide us your drawing, and we will produce as your drawing.
Or we can design as your requirements if you do not have a clear plan.
2.How to pay
TT and L/C are acceptable and TT will be more appreciated.
3. What is the delivery time?
It depends on order quantity.
Generally, the delivery time will be within 10 to 15 days.
4.How about our product quality?
Our steel prop piles are manufactured with first quality materials
What is steel quality?
5.This system is built from Q235 steel conical pipe with welded blades,
and can be applied in a wide variety of different geological locations
6.Port of loading
Tianjin ,Qingdao,Shanghai or Ningbo